Super-Fast Install & Unbeatable Value Wins GameChange 1.9 MW Roof System Order

GameChange Racking announced a 1.9 MW Roof System order to be installed in New York State. The business was won due to the GC Roof System's unbeatable value and super-fast install time.

Features of the GC Roof System:

  • Just two snap-together components
  • Aluminum and stainless steel components; 5, 10 and 15° tilt options
  • 55 psf ground snow load rated
  • Wind deflectors reduce ballast, typical loading 2.2 - 3.9 psf
  • Wind tunnel tested by industry-leader CPP and rated for 120 mph wind speed
  • Integrated grounding and wire management
  • Three men install 200 panels, racks and ballast per day: 1000 per week
  • Fastest install time - 50% less than competitors
  • Price starts from $.129/watt


Andrew Worden, CEO at GameChange Racking, was quoted: "We are proud of our Roof System as it embodies everything GameChange Racking stands for. With just two major snap-together components the installation process is very straightforward which saves our customers time and money. In addition to this simple design it is also robust. The Roof System has undergone rigorous boundary layer wind tunnel testing by internationally-renowned wind experts CPP and comes with an industry-best 20 year warranty."

"This 1.9 MW New York State Roof System order is exciting as it gives GameChange Racking another opportunity to ensure a quality system is delivered and installed quickly at an unbeatable price. We are growing rapidly due to word-of-mouth buzz and I expect this trend to continue as more of our premier ground, roof and carport systems are installed across the country."

GameChange Racking LCC
www.gamechangeracking.com