Split housing up-tower cooler

HYDAC's new UTC cooler will replace an existing non-HYDAC cooler in a GE 1.X turbine without requiring any structural modifications. This cooler line is comprised of components that will fit through the nacelle hatch using the tower winch. The cooler can then be assembled up-tower using step-by-step instructions in under 4 hours.

HYDAC | www.hydac-na.com

 


Volume: 2017 July/August