WWLP-22 News Features Citizens Energy 2MW Westfield MA Landfill Installation using GameChange Pour-in-Placeâ„¢ Racking
GameChange Racking announced the Pour-in-Place™ Ballasted Ground System was featured in the 2MW installation in the city of Westfield in WWLP-22 news on December 10th, 2014. The GameChange Racking patent pending protected Pour-in-Place™Ballasted Ground System has moved to a leadership position in the solar industry for landfills and brownfields.
Features include:
- Non penetrating ballasted system ideal for landfill, brownfield and rocky sites
- Pour-in-Place™ technology allows for self-leveling technology: 68% faster install than pre-cast
- Large ballast footprint reduces landfill cap loading
- Rated for windspeeds up to 120mph and snow loads up to 90 psf
- Passed rigorous electrical and mechanical testing by ETL to UL 2703
- Bankability technical due diligence assessment by industry leader Black & Veatch
- Wind tunnel tested by industry leader CPP
Watch the video here.
GameChange Racking LLC
www.gamechangeracking.com