WWLP-22 News Features Citizens Energy 2MW Westfield MA Landfill Installation using GameChange Pour-in-Placeâ„¢ Racking

GameChange Racking announced the Pour-in-Place™ Ballasted Ground System was featured in the 2MW installation in the city of Westfield in WWLP-22 news on December 10th, 2014. The GameChange Racking patent pending protected Pour-in-Place™Ballasted Ground System has moved to a leadership position in the solar industry for landfills and brownfields.

Features include:

  • Non penetrating ballasted system ideal for landfill, brownfield and rocky sites
  • Pour-in-Place™ technology allows for self-leveling technology: 68% faster install than pre-cast
  • Large ballast footprint reduces landfill cap loading
  • Rated for windspeeds up to 120mph and snow loads up to 90 psf
  • Passed rigorous electrical and mechanical testing by ETL to UL 2703
  • Bankability technical due diligence assessment by industry leader Black & Veatch
  • Wind tunnel tested by industry leader CPP


Watch the video here.

GameChange Racking LLC
www.gamechangeracking.com