Switching Surge Studies for Offshore Wind Plants

Presently, Europe is the world leader in offshore wind power with more than 2,300 MW of offshore wind plants installed. The first offshore wind farm was installed in Denmark in 1991. In North America, unlike land based wind generation, offshore wind farms are still in their infancy. There are currently no offshore wind farms operating in the United States. The Cape Wind project is an approved offshore windfarm in Nantucket Sound off Cape Cod, Massachusetts, United States. This wind farm may become the first offshore wind energy project in United States coastal waters. The Cape Wind plant will be connected to the NSTAR 115 kV Barnstable substation.

Offshore wind farms are generally connected to the onshore grid networks through land and submarine cables. Therefore, there are many power system design issues that exist for switching cables and it is usually necessary to identify any switching operations that can result in excessive transient, temporary and sustained overvoltage conditions on the power system. If the cable run is long, the large charging capacitance of the cable usually has to be compensated for with shunt reactors to avoid high steady state overvoltages. However, there is another issue that arises with energizing cables and shunt reactors together, called Zero-Missing phenomenon that occurs during a fault and has to be accounted for.

Therefore, it is very important to perform switching studies to evaluate the transient and steady state concerns associated with the offshore wind plant interconnection to the grid. For example, if a submarine cable has to be compensated by several shunt reactors, is it better to energize the reactors first and then energize the cable or is it better to energize the cable and reactor together as a unit?  Is it possible to energize the main transformer, cable and reactors together as a unit?  What are the operational problems? Switching surges can also be significant with long cable systems.  Energizing and de-energizing switching operations can result in significant transient overvoltages and overcurrents on the power system.  The long cables can also form lower order harmonic resonances with the system that can significantly increase harmonic distortion levels on the system.

In order to perform these switching studies, detailed frequency dependent cable models of the land and submarine cables are required. The cable models should be developed from the physical data (dimensions and material properties of the cable). The cable installation methods, bonding, and grounding should also be included in the model. Computer simulations should be conducted with transient programs like EMTDC/PSCAD for studying the effects of switching surges for various switching practices.

The Power Systems Engineering group at EnerNex has extensive experience in developing detailed frequency dependent land and submarine cable models and performing switching surge studies for offshore wind plants. EnerNex has worked with Energinet.DK, and DONG Energy in Europe and performed switching surge studies for their Anholt 400 MW and Borkum Riffgrund 335 MW offshore wind plants. Currently, EnerNex is working with NSTAR for the Cape Wind project that will begin construction in 2013.

~ By Chandra Pallem, Senior Consultant