criteria beyond initial purchase price. ease of purchasing, engineering assistance, production, inishing, which will generate, and deliver the valuable renewable solar en- 

Developers and EPCs should fully under- and strategic shipping. his can add extra value to the developers’ ergy that is expected.
stand their component manufacturing needs by doing more of the component manufacturing for them.
needs and work closely with the suppliers Properly assessing the ideal supply chain partners requires that Mark W. Turley is the solar market leader for Alexandria Industries. 
that can meet them.
developers and their EPCs devote additional time and research to He helps solar project developers and EPCs bring to life efective supply 

Additional fabrication processes, such choose the appropriate and most qualiied supply chain partners. chain and cost management strategies.
as machining, inishing, or welding can he return on that investment includes reduced risk, on-schedule 
add to total cost as well. Determine if
construction timelines, and higher site installation quality, all of
Alexandria Industries | www.alexandriaindustries.com
any of these additional processes will

be performed in-house, or by the sup- 
plier’s vendor partners. Outsourcing 
these processes may increase shipping 
costs, timelines, and handling, which also 

presents more opportunity for potential WITH OUR COMPONENTS IN YOUR 
damage. To maintain better control over 
the supply chain, consider working with 
an aluminum extrusion supplier that of- 
SOLAR RACK, THE SKY’S THE LIMIT.
fers multiple fabrication services to meet 
all of the projects needs.


Ship strategically
It is also critical that the developer or 
EPC determine the shipping schedule in 
advance. Will the components be shipped 

all together, or will they be delivered in 
sets of smaller shipments that are easier 
to manage on-site as the installation pro- 
gresses? Staggering the delivery schedule C-Channel
Z-Purlin

may be preferred to ease of-loading and 
installation timing for workers at the
job site. Components shipped all at once 
will need to be stored on-site or nearby 

until the racking systems are ready to be 
installed. In addition, planning to have 
someone on-site to manage delivery and 
assist in of-loading the support struc- 

tures can ease site installation issues.
C-Purlin
Create a back-up plan
Unfortunately, unforeseen problems can 

arise throughout the supply chain, which 
is why planning and creating back-up Images not to scale.
plans is so crucial. For example, if a severe 
weather event, such as a tornado afects a 

component manufacturing facility, have a 
plan to use an alternative facility to sup- 
ply necessary racking components to keep 
the project on schedule.
HYNES INDUSTRIES provides the strongest Absolute Reliability
Before a project begins, sit down and 
create a risk analysis model to outline all and most reliable Roll Formed components • On-hand inventory of over 37,000,000 pounds 
potential problems and solutions. he for your high volume racking needs:
risk analysis model can be detailed or of prime quality, American-made steel
• Adjustable Z-Purlin and C-Channel tooling • Unsurpassed design and engineering talent 
simple, but the initial planning can help • In-line programmable punching of holes,
and experience
reduce headaches or delays down the • Best-in-class order response and 99% on-time 
road.
slots and other features to help reduce 
delivery performance
system costs
• ISO certified quality system and 100% 
Partner with a vertically product traceability
Customized to your design, our components 
integrated supplier
will keep your solar racks standing for years 
One of the most common added costs of • 90 years of steel industry experience
to come.
managing a solar installation project is 
outsourcing component manufacturing Visit Hynes-Solar.com for 5 ways to add Absolute Reliability to your solar rack.
from multiple suppliers. Managing these 
complex relationships can be a challenge, 

taking a signiicant inancial and logistical 
toll on the project and slowing processes 
down.
HynesIndustries.com
Instead of having diferent suppliers [email protected] 
AMERICAN
S O L A R 800.321.9257
doing diferent tasks, select a partner ENERGY SOCIETY
3805 Henricks Rd. 
who ofers a vertically integrated supply- Youngstown, Ohio 44515
chain solution; combining manufacturing 
expertise with value-added services like


North American Clean Energy 23