Page 10 - North American Clean Energy May June 2018 Issue
P. 10
Bill Cook is a Renewable Energy Sector Manager for Aggreko, an international provider of power generation and temperature control solutions. In his role, Bill is focused on driving the company’s business strategies and relationships within the renewables market. He has been leading Aggreko’s business in the renewables sector for the last 12 years. Bill spends most of his time traveling and working with industry experts to develop solutions to their individual challenges. He lives in Chicago with his wife and four children.
A|ggreko | www.aggreko.com
NEW PRODUCTS FROM SKYLOTEC
SKYLOTEC.COM
CLAW
IGNITE RESCUE PRO 2.0 SKYSAFE
PROTON WIND PRO FLEX LORY PRO CONREST
SKYLOTEC offers you a highly innovative and functional range of fall protection equipment featuring the new smooth running CLAW Vertical Cable Sleeve for 3/8 & 5/16 inch diameter wire ropes. The IGNITE PROTON WIND and RESCUE PRO 2.0 Harnesses are light weight designs built for durability and comfort. The SKYSAFE PRO FLEX Lanyard includes an energy absorber designed for 6 and 12 foot free fall applications. The LORYPRO positioning lanyards allow you to work hands free with complete adjustability. The CONREST RESCUE Stretcher is ideal for tight confined space rescues. These product are ideal for work at height in the telecommunications, electrical utilities and wind energy industries. For more information please email us at [email protected]. skylotec.com
SKYLOTEC North America LP | Denver, CO USA | Tel 1-303-544-2120
North American Clean Energy
19
THE WIND INDUSTRY HAS GROWN TO THE POINT WHERE IT
is now the fourth largest source of electrical power in North America, after natural gas, coal, and nuclear. Industry reports indicate that global electricity generation from wind energy reached 60 GW in 2016. e U.S. Department of Energy’s Wind Vision report says the United States may be able to meet
10 percent of its electricity needs through wind power by 2020, 20 percent by 2030, and 35 percent by 2050. Further, according to the American Wind Energy Association (AWEA), there are now 13,759 MW under construction, and 15,875 MW in advanced development. e combined 29,634 MW represents a 27 percent year-over-year increase, the highest level reported since AWEA began tracking both categories at the beginning of 2016.
However, it takes power to make power, and the unpredictability of extreme weather conditions can cause disruptions to onshore and o shore construction projects. Against this backdrop, and to stay on schedule, many wind energy developers are turning to temporary power generation solutions that provide for a wider, more exible, and durable power capability across each stage of the wind farm lifecycle.
Temporary power generation solutions can be deployed at various stages of a wind farm development project to maintain productivity from both an economical, and operational standpoint... regardless of the waves Mother Nature makes.
HEICO FASTENING SYSTEMS
The best value to secure bolts.
HEICO-LOCK®
WEDGE LOCKING SYSTEMS
The HEICO-LOCK® wedge locking system is the reliable solution to the problem of securing bolted joints in high vibration assemblies against self-loosening by rotation!
WWW.HEICO-GROUP.COM
wind power
Wind Solutions
personnel with the correct equipment.
e generators and load banks supplied
to the industry enable turbines to be commissioned prior to connecting to
the power grid; this bene ts return on investment (ROI) by letting the developer begin production as soon as the project completes the wind farm’s substation. Saving time with reliable power equipment is important, given the tax incentives and credits available once the wind energy system is fully operational.
Operations and maintenance phase
In the post-commissioning phase, low- voltage power generators at the base
of each turbine can power ancillary equipment, such as lighting, and the hydraulic pumps to turn the rotor (to prevent bearing lock up). Alternatively, a central high voltage package can power the integrated system from
one point of connection, keeping transformers and switchgear running, in addition to the turbines.
Maintenance typically uses temporary power from standard generators, while transformers are available for the higher voltages, such as 690V (the industry standard for many years). In fact, transformers have been supplied for multiple uses; to connect the circuits in the eld, 480 V/34.5 transformers in the 2,500-to 5,000 kVa range are provided.
To keep the system operational, power has been supplied to the eld when the main transformer has failed, or the utility has to take the distribution system out of service. Whether it is a maintenance issue or an emergency situation, sometimes an entire wind farm must be taken o ine. When this occurs, a temporary mini-grid solution can support the entire wind farm, providing enough power for all the turbines to pitch and yaw correctly, and protect all warranties associated.
O ering unique designs and reliable models that weather severe conditions, temporary power generators can signi cantly reduce the costs and risks
of downtime across the lifecycle of a project. While Mother Nature never stops, the capabilities of such generators continue to expand, as the industry transitions into o shore projects in North America and elsewhere.
Overcome Challenges
in Hazardous Conditions
by Bill Cook
Planning
Compared to onshore wind energy projects, planning for o shore wind farms presents a new learning curve. Much of the testing can be done at the manufacturing facility on both high and low voltage systems, but additional onsite testing is required for all projects.
For example, in order to progress from
the planning phase into the construction
phase, a project needs a reliable power
source for LIDAR. LIDAR ensures the
collection of a constant stream of information on wind, birds, and other wildlife. In this phase, the operation cannot lose power, even when challenged by turbulent waves and extreme wind. Any temporary power generation equipment must be waterproof to keeping the planning stage on track.
Construction
A reliable source of power is also required throughout the construction phase. Temporary power for large and small loads can be supplied with a wide range of generators designed to withstand any climate condition.
Testing the high voltage (HV) cable and substation requires a temporary power source. Per o shore construction, an HV cable soak test is conducted for building
the substation, so that the developer can test all the relays and transformers on
the substation prior to oating out. is prevents potential failures that will be
costly to rectify o shore. For onshore projects, the cable soak is the rst step in the commissioning process for each circuit of a wind farm. When the circuit is energized, this is the rst time that cable has received power. e developer then has the entire circuit inspected prior to energizing the transformers.
Commissioning
O shore, generators are used to commission or condition the turbines. is often includes use of generators on the MAP that power the essential equipment, followed by a greater amount of power to pitch and yaw the turbines. Failure to provide this motion could result in damage to the turbine.
Novel o shore power solutions have been created for this requirement, with the operating environment in mind; generators that are lightweight, durable and can synch together work to minimize the load. LV and HV back feeding solutions can also be provided for the o shore substation (OSS), further minimizing cost for the developer.
e past 20 years have seen certain variability and induction problems with wind- farm projects, and continues to make connecting to the utility grid a major challenge. is is where temporary power suppliers have played a pivotal role. e average size of wind driven generators has increased from 0.5 MW in the mid-1990s, to 8-MW in the latest o shore models. Commissioning these systems into service is expedited with mini-grid solutions, which provides the capability to manage power from the turbines, along with an associated array of scalable generators and transformers.
Onshore, generators are used to commission turbines prior to grid interconnection. is is often required because the transmission line is not complete, or the interconnection will occur, leaving too short a timeline to commission all the turbines prior to the sites Commercial Operation Date (COD). To complete the function on a large scale, the power from the turbines must be absorbed and managed by technically-trained