Block ip Trap

SHARC Sewage Heat Recovery System

04 Feb 2016

The purpose of this case study is to review the collected data from the Sewage SHARC system operating for the past 2 years at the Seven35 Building in North Vancouver, BC. The SHARC system is used to preheat the domestic hot water for the 65 suites and common usage. This study will re-confirm the information provided by Stantec Engineering outlined in the case study done on September 20, 2012. The system has now collected 2 complete years of operational data. For the purpose of this study we have randomly selected 20 days for analysis.

Click to download PDF File