Winergy Commissions Largest Test Bench for Wind Turbine Gearboxes in Australia

Gearbox manufacturer Winergy has invested in a 2.8 megawatt load test bench in its Service Center in Rockhampton, Australia. This investment means that the facility now has Australia's largest and most advanced test rig for wind power gearboxes. 

As a significant quality attribute a load test is essential for every wind turbine gearbox prior to installation. With the commissioning of a 2.8 MW full load test bench this is now also available at the Winergy Service Center in Rockhampton, Australia. "Quality is the priority for every product we supply. This test bench helps us to secure the reliability of our gearboxes. The result are minimized lifecycle costs for our customers", said Winergy Vice President Service Detlef Eißing. From now on every gearbox that is serviced and refurbished in Rockhampton is subject to the Winergy test routine. With load tests the gearbox manufacturer completes its full original service and repair capability for Winergy products in Australia. 

The gearbox test rig will provide a much needed service capability for Winergy customers in the region and beyond. Opened in 2013, the 1,500 square meters Service Center in Rockhampton is the hub for Winergy's service activities in the region of Australia. Winergy Original Service portfolio covers maintenance, repairs either in the field or in the workshop as well as spare parts and gearboxes. The new investment by Winergy has been made as Queensland's Government committed to increasing the uptake of renewable energy to drive jobs and investment and reduce emissions.

Winergy | www.winergy-group.com